Low volume injection molding for new products
From Prototype to Your First 1,000 Molded Parts
We take new plastic parts from drawing to first production: a free DFM review, a quote that separates mold cost from part price, a steel mold with T1 samples in 3 to 4 weeks, and low volume production from 1,000 pcs. For fewer parts, we can CNC-machine them in-house first.
- Free DFMquote in 1–2 working days
- 3–4 weekssimple mold to T1 samples
- From 1,000 pcslow volume production

Is this you?
Where new product teams usually are when they contact us
Plastic product development rarely runs in a straight line, so tell us where your part is today.
Prototype is done
The 3D-printed or machined part works; now it needs a production mold.
First order is small
You need 1,000 to a few thousand parts to test the market.
Budget is fixed
You need to know the mold cost and part price before you commit.
Launch date is set
Samples have to arrive in time for testing, photos or a trade show.
Choose your route
CNC parts, a low volume mold, or a multi-cavity mold?
Low volume injection molding usually sits between prototypes and full production. The right route depends on how many parts you need and how settled the design is; we recommend one in the free DFM review.
Swipe the table to compare all three routes →
| CNC-machined parts | Low volume steel mold | Multi-cavity production mold | |
|---|---|---|---|
| Best for | Prototypes and quantities below 1,000 pcs | Launch orders from 1,000 pcs; design mostly settled | Proven parts with high yearly volume |
| Mold investment | None | Lower: usually a single-cavity mold | Higher: up to 32 cavities |
| Part price | Highest per part | Medium | Lowest per part |
| Time to parts | Shortest, no mold to build | About 3–4 weeks to T1 (simple mold) | About 4–6 weeks to T1 (complex mold) |
| Design changes | Easy: change the program | Possible: simple mold changes take about one week | Costly: every cavity has to change |
| Material | Machined from plastic stock | The production resin you specify, such as ABS, PC, PC+ABS, PP, PET or POM | |
What sets the mold price: injection mold cost, the eight factors · When more cavities pay off: multi-cavity molds
What worries new product teams
The surprises that delay a first mold, and how we prevent them
Most of these come from decisions made too late. Low cost injection molding comes from settling them early, not from cheaper steel.
How it works
Six steps from drawing to your first production run
Send the drawing
3D file, resin, finish and first quantity
Reply within 24 hoursDFM and quote
Free DFM report; mold and part priced separately
1–2 working days3D mold review
Gate, parting line, cooling and steel agreed with you
Before steel is cutMold and T1
Mold built in our toolroom; T1 measured
3–4 weeks, simple moldSign the sample
Corrections if needed, then your approval
Free T1 samplesFirst run
Production to the approved process
~1 week under 5,000 pcs
DFM knowledge
Design mistakes that make a first mold expensive
These are the issues our DFM review catches most often on first-time parts. Each one adds steel work, cycle time or rejects.
- Uneven wall thickness causes sink marks and warpage; core out thick areas
- No draft on vertical faces makes parts stick and scuff; add draft, more on textured faces
- Undercuts that are not needed force slides or lifters; redesign the snap or opening if you can
- Tight tolerances everywhere raise cost; keep ±0.03 mm for the features that assemble
- Sharp inside corners concentrate stress; add radii
- No decision on visible faces leaves gate and ejector marks to chance; mark the A-surfaces early
What to send
What we need for an accurate first quote
The more of this we have, the fewer assumptions sit in the price.
- 3D file (STEP) and 2D drawing: geometry, tolerances and critical features
- Resin or performance need: sets shrinkage, steel and cycle time
- First order and yearly volume: decides cavity count and route
- Finish and color: polish, texture, painting or printing
- Target date: lets us plan the mold build backwards
Proof
From design to molded part, in one factory
One of our custom projects: the mold designed around the part, then the molded frame. Design, toolroom and molding floor are under one roof in Dongguan.
Read more: Case studies · Mold design and manufacturing · Mold trial & T1 approval


Terms at a glance
What you can count on
Honest scope
What we do not do
- Industrial design or styling from a sketch
- Electronics, circuit boards or final device assembly
- Parts that require ISO 13485 or IATF 16949 certification
FAQ
Questions before your first mold
What counts as low volume injection molding?
Industry guides usually put it at roughly 1,000 to 10,000 parts. Our production orders start from 1,000 pcs, on a steel mold built in our own toolroom, so the same mold can carry on into higher volumes.
How much does a first injection mold cost?
It depends mainly on part size, cavity count, steel, slides or lifters, surface finish and runner type. Send your drawing for a free DFM review and we quote the mold and the part price separately within 1 to 2 working days.
Can you make fewer than 1,000 parts?
For prototypes and quantities below 1,000 pcs, we can machine the parts on our in-house CNC machines, then move to a production mold once the design is approved. CNC parts are outside our ISO 9001 certificate scope.
How long does it take to get the first parts?
About 3 to 4 weeks from mold start to T1 samples for a simple mold, 4 to 6 weeks for a complex one. After you approve the samples, first runs below 5,000 pcs usually ship in about one week.
What if the design changes after the first samples?
We review each change with you before steel is cut again. Simple mold changes take about one week, and DFM before the first cut is how we keep these changes rare.
Who owns the mold and the design?
You do. We sign an NDA, the mold belongs to you, and we never use it to make parts for anyone else. Mold payment is 50% with the order and 50% after sample approval.
Choose your path
Other ways to work with us
Pick the page that matches how you buy.
Export injection molds
Molds built to run on your own presses.
Buying partsContract injection molding
Lot-to-lot consistent parts from 1,000 pcs.
You are hereNew product, low volume
From prototype to your first 1,000 parts.
Switching suppliersMold transfer & second source
Switch molders without a gap in supply.
Send your drawing for a free DFM and quote
3D file, resin, first quantity and target date. Maggie replies within 24 hours on working days, and the quote follows in 1 to 2 working days.
