For buyers moving molds or adding a second source

Switch Injection Molders Without a Gap in Supply

Two ways to move production to us: transfer your existing mold, or let us build a new mold from your approved part. Either way, we inspect, trial and measure against your approved sample before your old supplier stops, so your line keeps running.

  • ±0.03 mmchecked on WKM CMMs
  • 3–4 weeksnew mold to T1 samples
  • ISO 9001:2015No. 24CN34511981Q
Plan my mold transfer ↗Read the transfer checklist
Both halves of a multi-cavity injection mold in the ACKOR toolroom

Is this you?

Why buyers start switching injection molding suppliers

Each situation needs a different plan, so the first thing we ask is which one is yours.

Quality keeps slipping

Parts passed at T1, but lots now drift at your current molder.

Price or delivery changed

Your supplier raised prices or keeps missing ship dates.

One source is a risk

You need a second qualified source for a part you cannot stop.

Your molder is closing

The mold has to move, and the part has to stay approved.

Two ways to move

Transfer your mold, or build a second one

We recommend one route after we see the mold condition, the documents you hold and your yearly volume.

Transfer your existing moldBuild a new mold from your approved part
Best whenThe mold is in good condition and you own itThe mold is worn, the old supplier will not release it, or you want two running sources
Time to approved partsShorter: inspection, servicing if needed, then T1About 3–4 weeks to T1 for a simple mold, 4–6 weeks for a complex one
What we needThe mold, 3D files, process sheet and last approved samplesApproved samples or drawing, resin grade and appearance standard
Your old supplierShips the mold after you have built safety stockKeeps running until our parts are approved
Mold ownershipStays with youThe new mold is yours, paid 50% with the order and 50% after sample approval

What worries buyers

What usually goes wrong in a transfer, and how we prevent it

These are the problems buyers who have moved molds before tell us about most often.

You are worried that…
What we do
The first trial after the move fails
We check and service the mold on arrival, compare your old process sheet with our press setup, and run T1 with your resin grade.
The old supplier holds back files and spares
Before anything ships, we confirm ownership with you and list every drawing, process record and spare part to collect.
Your line runs out of parts
We plan the move around a bank of parts from your old supplier, and you switch only after you sign our samples.
New parts do not match the old ones
Your current approved part is the baseline: we measure old and new on our CMM, feature by feature and cavity by cavity.
A hot runner or multi-cavity tool behaves differently
We test every heater zone and measure every cavity, not just one, before we call the trial a pass.

How our mold transfer services work

Six steps from your old molder to approved parts

  1. Review

    Ownership, files, photos, volume and timing

    Before you commit
  2. Safety stock

    Your old supplier builds a bank of parts

    Before the mold ships
  3. Inspect

    Mold checked and serviced in our toolroom

    On arrival
  4. Trial

    T1 with your resin; process recorded

    After servicing
  5. Measure

    CMM report against your approved part

    With the T1 samples
  6. Approve

    You sign the samples; production starts

    Orders from 1,000 pcs

Know before you move

What to collect from your old supplier

The mold is only half of what made good parts. The rest is the process knowledge. Ask for these before the mold leaves:

  • Written proof that you own the mold, and a release from the old supplier
  • Part CAD and 2D drawing, with the current revision
  • Mold drawings, plus the spare parts and electrodes list
  • Molding process parameters: temperatures, pressures, times, drying
  • Last approved sample and its measurement report
  • Photos of both mold halves and every cavity, plus last-shot parts

Extra care

Hot-runner and multi-cavity molds

These molds hide most transfer problems. Before the first shot we check:

Hot runner: controller zones, heaters and thermocouples, nozzle tips and gate wear. We commonly run YUDO, Husky and HDT systems.

Multi-cavity: every cavity is measured and filling balance is checked, because one bad cavity can mix into good lots.

Press fit: locating ring, nozzle radius, ejector pattern, tie-bar spacing and water connections against our press.

Full mold transfer checklist →

Proof

The toolroom and inspection room that take over your mold

Your mold moves to our own factory in Dongguan, not to a trading office.

2,600 m²factory in Dongguan
15Yizumi injection molding machines
2 + 1WKM CMMs and a VMS 4030 vision system
Since 2006mold-making team

Related: Mold trial & T1 approval · First article inspection · Case studies

Molded part measured on a WKM CMM at ACKOR
CMM check against your approved part
Small features measured on the VMS 4030 vision system
Vision measurement of small features

Terms at a glance

What you can count on

Free DFM reviewPart, mold photos and files reviewed before you commit
Your moldOwnership stays with you, under NDA
From 1,000 pcsProduction orders after approval
Reply in 24 hoursOn working days, in English or Japanese
Video auditToolroom and molding floor on a video call

Honest scope

Transfers we do not take on

  • Die-casting molds or metal molds
  • Molds you do not own or cannot get released
  • Parts that need ISO 13485 or IATF 16949 certification

FAQ

Questions before you move a mold

How long does a mold transfer take?

It depends on the distance, customs and the mold condition. Inspection and the first trial come first; after we review the mold photos, drawings and process sheet, we send a dated plan, and you keep a bank of parts until our samples are approved.

Can you run a mold made by another supplier?

Yes. We need the tool list, drawings, a few current photos, the resin grade and your last approved samples. We check the mold against our 15 Yizumi injection molding machines and the drawing before the mold ships.

Can you build a new mold from our approved part instead?

Yes. We build a new mold from your approved part or drawing, with T1 samples in about 3 to 4 weeks for a simple mold and 4 to 6 weeks for a complex one, and measure T1 against your approved part.

What documents should we collect from the old supplier?

Proof of mold ownership, the part CAD and 2D drawing with revision, the mold drawings, the molding process parameters, the last approved sample with its measurement report, and the maintenance and repair history.

What makes a moved mold fail at T1?

Usually because the new setup differs from the old process: press interface, resin grade, drying, temperatures, cooling connections or hot-runner settings. We compare these with your old process sheet before any steel is changed.

Who owns the mold after the transfer?

You do. We sign an NDA and never use your mold to make parts for anyone else.

Send your mold details for a free transfer review

Part drawing or photos, mold size, cavity count, resin and yearly volume. Maggie replies within 24 hours on working days.

Start the review ↗
WhatsApp

PRIVACY

Your project information stays in your hands.

The project form on our home page sends your name, email, company and project details to ACKOR so we can reply. You can also attach up to 5 drawings (20 MB each); files are used only to review and quote your project.

WhatsApp links open WhatsApp, where its own privacy terms apply. Google Fonts may be requested to display typefaces, and hosting services may process routine access information. For business enquiry questions, contact maggie@ackor-mold.com.